Architects Atelier gets asked allot about Party Wall Notices and Agreements. Here’s a basic summary of what you need to know about Party Walls – what they are, what the paperwork is all about, and when it’s needed.

Should I bother ?

Yes! The party wall process places a statutory obligation on a person doing building work to notify their neighbour if it affects a party wall. If so, they must enter into a party wall agreement. It is as important as planning consent or building regulation approval. If you don’t do it, your neighbour could get an injunction stopping you.

What is a party wall?

In simple terms, a ‘party wall’, is a wall which divides two properties; a party structure could be a ceiling/floor which divides properties such as flats; and a party fence wall is a boundary wall astride the line of junction. If you want to carry out building work which affects any of these, then you may need to give your neighbour a Party Wall Notice.

However, notice is sometimes needed where there is no direct contact and where structures are completely in your land. If you are carrying out any excavations, for example, forming foundations, reducing ground levels, or constructing a basement, you need to check if your neighbour’s property is within three metres of your work. If it is, you probably need to serve a notice.

Take a look at this flowchart to work out if you should have/need to serve a notice.


What type of work requires a Party Wall Agreement?

Any work that can impact the above. Loft conversions and extensions, basements, rebuilding or repairing a boundary wall; excavation within three metres of your neighbour’s property, which could include new drainage (even if you are not attached to them); building on, or up to the boundary between neighbours.

How do I issue a Party Wall Notice?

You can issue your own notices and the Party Wall Act is specific about the information they must contain. Get it wrong, and the notices will not be valid. Although you can send a letter, standard forms are usually used. These are available on our website. Make sure you get the information on the notice correct. You may also need to serve different notices for different sections of the Party Wall Act.

Remember to serve a notice to all neighbours with an interest of longer than 12 months. If you have a block of flats next door, this may mean each flat and the freeholder. Check you are giving the required (in most cases) two months’ notice before you start work.

For more help, you could engage an experienced RIBA Architects like us.  Remember if the notices are wrong, or do not contain the right information they will not be valid. If you have to start again, the two month notice period also starts again. If your neighbour dissents from your notice you will have to appoint a party wall surveyor. The Act says you cannot act as your own party wall surveyor. If you do not appoint a surveyor then your neighbour can do this for you.

What do party wall surveyors do?

The surveyor will look over your plans, check the notices are OK and may ask for more details or clarifications to make sure that the work is unlikely to cause damage to your neighbour’s buildings. The surveyor will visit your neighbour’s property and agree a record of its condition before your work starts. They will come to agreement and serve what is known as a Party Wall Award. This will set out the works that are authorised and what happens if something were to go wrong. It is a binding, legally enforceable agreement.

The Award may also include direction as to how the work is undertaken, access to your neighbour, the need for financial security, what will happen if damage is caused and will deal with any costs, including surveyors fees. In most cases you will be responsible for your neighbour’s costs.

If the surveyors cannot agree, then they will refer the matter to a ‘Third Surveyor’ for arbitration. The third surveyor will prepare and serve a binding award.

I have received a party wall notice, what do I do?

Don’t ignore it! The party wall notices will tell you that your neighbour is planning to carry out some building works that may affect your property or boundary walls.

Within 14 days, you must reply in writing to confirm whether you agree to the work stated in the notice, or dissent from the notice. If you don’t, you will automatically have dissented and within a further 10 days you must appoint a surveyor. If you do not, then your neighbour will appoint one for you. You may be able to agree with your neighbour to use just one surveyor to act for you both.

Can I stop the works or appeal a party wall award?

The Party Wall Act grants statutory rights to work on a party wall or near to your property, so providing these are adhered to, you cannot use the Party Wall Act to stop any works. Instead you will need to object on planning permission grounds. You can appeal the Party Wall Award in the County Court within 14 days of it being served.

Can I get compensation?

Not usually, but if your neighbour uses a part of a party wall that was built by you, he may have to compensate you for the cost of building it.

What happens if damage is caused to my property?

The Party Wall Award will detail how any damage is to be made good. The surveyors will agree the work and liability and your neighbour can do the repair works. Alternatively, you can ask for a payment in lieu so that you can carry out the repair works.

Any more questions?

Do you have questions about party walls that haven’t been answered here? Comment and let us know.

You can also get in touch via the contact form on this website or call us on 01322 837 810.




Start 2018 with Planning that all important extension

Been thinking about that extension and been it putting off? Then this article is for you, Below, Barry Stott-Brookes from Architects Atelier Ltd, outlines the typical planning to completion process for a domestic extension project.

Now is the right time to start thinking about more space at home for Autumn 2018. Whether it’s increased living space that you need, improved amenities or an outbuilding for the kids – why not let AAL’s experienced design team help you through the process required, to achieve the space you need in time for Autumn.

Whatever you’re planning the AAL team can guide you through the processes required to realise your construction project.

At AAL, our award nominated design team have extensive experience in:

  • Creating beautiful spaces;
  • Optimising the design to balance your needs against your budget;
  • Guiding projects through the planning process;
  • Developing the design in coordination with our structural engineering team;
  • Advising on ‘best practise’ for neighbourly matters such as party wall agreements.

Of course, you’ll need a builder once the design is signed off – not to worry, working with us gives you access to AAL’s ‘little black book’ of the very best local trade contacts.

If you’re planning to have the space you need this year ready for use in Autumn 2018 the following timeline of a typical construction project demonstrates why NOW IS THE TIME to talk to us:

Now – Start the design work.

March  2018 – Submit to local authority for planning sign-off.

May 2018 – Receive Planning Consent.

June 2018 – Structural engineering design and builder appointment; start party wall processes.

August 2018 – Party Wall processes completed and start building works! Depending on the size of the project it might be a 12 to 20 week build programme, your builder can advise.

November 2018 – Works complete just in time for the school Christmas Holidays 2018!

Don’t move, improve!  Let team AAL help you with your project, contact us today for a no obligation discussion.

Please visit our resources page for a free project planning pack to assist you in your project :